Shandong Longkou HED Project Successfully Completed

Oct. 22, 2021
Share:

This project contracted by BIC, is located 1.2KM east of Zhuyouguan Town, Longkou City, Shandong Province. It adopts Hydraulic Elevator Dam, with a total width of 173.8 meters and a height of 2.5 meters, including 22 steel panels, and each span is 7.9 meters *2.5 meters. Meanwhile, it supports manual control and PLC electric control system.


The whole project can be able to achieve dam-lifting water retaining, dam-lowering flood discharging, water retaining at any height, no power dam-lowering and other functions. BIC successfully completed the design, manufacturing, installation and commissioning, and site construction tasks stipulated in the contract, and therefore won consistent praise from the owner, supervisor and civil construction party. After the completion of the project, it is mainly used for urban landscape water storage, improves the urban ecological environment, enhances the riverside environment and urban appearance, also adds a water-friendly leisure and entertainment place for the majority of residents. At the same time, through the construction of the project, it not only eliminates the security risks, but also plays the benefits of water storage, irrigation and groundwater replenishment.


Shandong Longkou HED Project Successfully Completed


Shandong Longkou HED Project Successfully Completed


Shandong Longkou HED Project Successfully Completed

Inquiry List(0)
Already in the Inquiry List!

0