Home >  Project > Hydraulic Elevator Dam > Yitong River Maintenance and Renovation Project

Yitong River Maintenance and Renovation Project

L*H: 110*1.8 (m)

Applications: Landscape, Water storage

Location: Jilin, China




It prevents ice formation in front of the HED and improves ice melting efficiency. Not only achieves the purpose of landscape and water storage, but also ensures the smooth operation of HED in cold winter areas.


Yitong River Maintenance and Renovation Project


Yitong River Maintenance and Renovation Project


Yitong River Maintenance and Renovation Project


Yitong River Maintenance and Renovation Project


Yitong River Maintenance and Renovation Project


Yitong River Maintenance and Renovation Project


Inquiry List(0)
Already in the Inquiry List!

0