Home >  Project > Hydraulic Elevator Dam > Longkou HED Project

Longkou HED Project

L*H: 195.4*2 (m)

Applications: Prevention of seawater intrusion, Flood Control

Location: Shandong, China



Applications: The project is located at the mouth of the Huangshui River. The designed flood control standard is once in 50 years. The normal water retaining height of the Hydraulic elevator dam is 2m. The construction purpose is to prevent seawater intrusion and conserve fresh water sources.


Longkou HED Project


Longkou HED Project


Longkou HED Project


Longkou HED Project

Inquiry List(0)
Already in the Inquiry List!

0