Home
About Us
Company Profile
Video
Product
Hydraulic Elevator Dam
Inflatable Rubber Dam
Simplified Elevated Dam
Melting& Deicing Device
Containerized Water Treatment Plant
Seawater Desalination Plant
Self-circulating Toilet
Project
Hydraulic Elevator Dam
Simplified Elevated Dam
Inflatable Rubber Dam
Melting& Deicing Device
Containerized Water Treatment Plant
Seawater Desalination Plant
Self-circulating Toilet
Service
Security Monitoring Cloud Platform
Technical Service
Training
Technical Resources
News
Contact Us
EN
EN
ID
Home
About Us
Company Profile
Video
Product
Project
Hydraulic Elevator Dam
Simplified Elevated Dam
Inflatable Rubber Dam
Melting& Deicing Device
Containerized Water Treatment Plant
Seawater Desalination Plant
Self-circulating Toilet
Service
Security Monitoring Cloud Platform
Technical Service
Training
Technical Resources
News
Contact Us
News
Home
>
News
Mar. 23, 2026
BIC Holds Technical Exchange Meeting with Cangzhou Water Conservancy and Hydropower Survey and Design Institute
On February 25th, the technical exchange meeting between BIC and the Cangzhou Water Conservancy and Hydropower Survey and Design Institute was successfully held in Cangzhou.
Read More
Mar. 17, 2026
BIC 2026 Annual Work Planning Meeting was successfully held
On the afternoon of February 9th, the BIC 2026 Annual Work Planning Meeting was successfully held in the company's conference room. The meeting aimed to comprehensively review the achievements and shortcomings of the work in 2025 and scientifically plan the development blueprint for the new year.
Read More
Mar. 10, 2026
Hydraulic Flood Barriers vs Traditional Flood Protection: Which Is Better?
Hydraulic/moveable barriers (retractable gates, inflatable or panel systems) win for speed of deployment, reusability, lower labor and less visual/permanent impact in many urban sites.
Read More
Mar. 03, 2026
Sluice Gates: Design, Operation, and Applications in Water Infrastructure
A sluice gate operates through controlled vertical movement to regulate water flow. It typically consists of a solid gate leaf—commonly fabricated from metal or reinforced composite materials—that moves within guide grooves or tracks fixed to a supporting frame.
Read More
Feb. 26, 2026
Completion of Beijing Sanli River HED Project
Recently, the renovation project of the Beijing Sanli River Hydraulic Elevator Dam (HED), undertaken by BIC Construction, has been officially completed.
Read More
Feb. 17, 2026
Beijing Guishui River HED Project Successfully Completed
Recently, the Beijing Guishui River Hydraulic elevator dam (HED) project, located in Yanqing District, has been fully completed and officially put into operation.
Read More
1
2
3
4
...
35
36
Inquiry List(
0
)
Empty
Already in the Inquiry List!
0