Engineering
Current Location > Home > Engineering
Xiaoling River ( Yangshan Section ) Comprehensive Treatment project ( stageⅡ )i
( the dam is 48m in length and 2.5min height; Augest 2015 )

This project contains one Hydraulic Elevator Dam ( 42m in length; 2.5m in height )

 and one Hydraulic Flap Gate( 6m in length and 3min height ) which are used for 

landscape impounding, driftage, and reserving ecological migration passage for their 

typical animal, Chinese Turtle.





Add:20 West Chegongzhuang Road, Beijing, China  Tel: +86-010-68417284-8017
Copy right Beijing IWHR Corporation (BIC)
点击咨询网站建设客服